DELTA STRUCTURAL STEELWORKS – CHIBUKU SUPER-FLOW PLANT

Project Overview

Project NameSTRUCTURAL STEELWORKS FOR NEW CHIBUKU SUPER-FLOW PLANT AT DELTA FAIRBRIDGE BULAWAYO
ClientDelta Beverages (Pvt) Ltd Chibuku Plant (Byo)
Engineers/Architect/Main ContractorInter-Africa Consulting Engineers
Project TypeStructural Steelworks
PeriodOctober 2014 to September 2015
ScopeTakedown existing Plant and structural steelwork. Supply, fabrication and erection of new structural steelwork including sandblasting and painting of existing steelwork. Supply and installation of new Open grid flooring, handrailing. Rigging and installation of new imported Plant equipment